• 107 words0.5 min read

    Returned the bell tower to its former glory by replacing with new powder coated metal units and new Code 5 lead roofs.

  • 84 words0.4 min read

    In a matter of days we installed new decking, primed and added a 2 layer felt system.

  • 1071 words5.4 min read

    CBRE determined that the roof was failing badly so we were contracted to cut and seal the existing roof membrane and then install a new torch on bituminous felt system on top