CBRE determined that the roof was failing badly so we were contracted to cut and seal the existing roof membrane and then install a new torch on bituminous felt system on top
CBRE determined that the roof was failing badly so we were contracted to cut and seal the existing roof membrane and then install a new torch on bituminous felt system on top