We have been lucky enough to work on several stations using natural slate and man-made slate.
This project had a lot of issues to overcome with being a listed building and fully occupied. All the slate was stripped and saved for re-use to the front elevations.
On site the full roof coverings including lead, slate and flat roofing were replaced.
Stripped off all of the existing tiled roof covering including PV panels and installed new Air Tile (Metal Roof System) and re-installed PV Panels.
Extremely complex project with multiple trades working together to get the job completed, all whilst working around the busy Plymouth Primary School.
Returned the bell tower to its former glory by replacing with new powder coated metal units and new Code 5 lead roofs.
In a matter of days we installed new decking, primed and added a 2 layer felt system.